BIG JV TRANSPORT · LOAD COST EXAMPLES

A $1,500 Load Is Not $1,500 in Profit: Work Through the Costs

By Big JV Transport · October 16, 2026

Follow a clearly labeled sample load from gross revenue through fuel, dispatch fees, reserves, and the costs still left to cover.

Big JV Transport Freightliner semi truck
Big JV Transport · Detroit freight transportation

Write the assumptions before the answer

Consider an illustrative $1,500 load with 400 loaded miles and 100 empty miles. Assume 6 miles per gallon, diesel at $5 per gallon, a dispatch fee of 8% of gross, and a factoring fee of 2.75% of gross. These are teaching inputs, not live fuel prices, market rates, Big JV charges, or a promise about truck performance. Use the fees in your own agreements when reviewing real work.

Count all 500 miles

The loaded-mile rate is $1,500 divided by 400, or $3.75. Including the 100 empty miles brings the rate across the planned trip to $3.00 per mile. If the truck must travel farther after delivery, add that distance to the plan. Keep confirmed miles separate from a hoped-for return load. The goal is to compare the revenue against the route you expect to drive.

Calculate fuel and percentage fees

At 6 miles per gallon, 500 miles requires about 83.33 gallons. At the assumed $5 price, estimated fuel is $416.67. The 8% dispatch fee is $120, and the 2.75% factoring fee is $41.25. Subtracting those three amounts from $1,500 leaves $922.08. That figure is an interim balance, not net profit or driver take-home pay. Actual gallons, fees, and receipts may differ.

Set aside reserves without calling them profit

Suppose the operator chooses to transfer an illustrative 20 cents per total mile to maintenance savings and 5 cents per mile to tire savings. For 500 miles, those transfers total $125, leaving $797.08 available before the other costs below. These sample savings amounts are not industry standards. A reserve transfer protects cash for future work; it is different from a repair bill incurred on this trip, so avoid counting the same cost twice.

Account for the costs the sample has not covered

Driver compensation, insurance, truck or trailer payments, permits, tolls, parking, administrative expenses, and any other applicable costs still need a place in the calculation. Allocate fixed costs using a consistent method and review that method when mileage changes. Decide how owner labor is represented so you do not mistake unpaid work for business profit. This article does not calculate a final net margin because those inputs have not been supplied.

Compare estimates with the delivered result

Save the quoted rate and assumptions before booking. After delivery, compare them with actual miles, fuel purchases, approved additional charges, and the amount received. Diesel prices vary by location and over time; the EIA explains the components behind those prices, while your receipts show what this trip actually cost. Big JV’s calculator can help organize an estimate, but the completed records are what let you improve the next one.

Source: EIA: Diesel prices and outlook

Run your own load numbers

Replace the sample inputs with your quoted rate, total miles, fuel estimate, and actual expenses in the free Big JV calculator.

Open the load calculator

Keep planning your next move

More trucking guides

Examples are illustrative. Actual costs, equipment needs, and availability vary.